Re: Unit of measure for calculation type C must be completed

$
0
0

Hi,

 

We encountered this error message and resolved the problem by applying the following 3 SAP Notes:

 

a)     Note #1022928 - Unit of Measure for Calculation Type C Must Be Completed

        (Previously Mentioned)

b)     Note #1702484 - Unit of Measure for Calculation Type C Must Be Completed

c)     Note #1517648 - Default Conditions Added for Product Category Item Type

 

Although the contract required is similar to a "Limit" item, but had to be placed for bid, then the RFX PS Item Type was set to "Service" to receive the bid responses.  After accepting the bid response, then we created a contract from the bid response.  Since it was to be a "Limit" type contract, then we immediately removed the data from the following fields:

 

  1. Remove the Quantity
  2. Remove the Unit of Measure
  3. Remove the Price
  4. Remove the Price Condition

 

After removing the values from these fields, then we switched the PS Item Type from "Service" to "Product Category".  We added the Guaranteed Minimum and account assignment data to encumber the funds.  We were able to "Release" the contract successfully.

 

Bob Zinsmeister

 

 

 

 

 

 

 