Hi Indrajit,
It is possible to run with Classic Scenario as well. In ths case the PR would be created in ECC which would then create a SC in SRM and then the PO would be created for it in ECC system.
So i dont think there should be a problem with Classic Scenario.
Regards
Pramod.