Dear Archit,
First of all big thanks for your help.
Maybe I wasn't clear enough in my previous posts, but the solution you propose doesn't fit in our requirements.
In our case, we need to know in ERP side (just conferencing data in ERP) if the material document entered successfully in SUS.
For example, if the material document was successfully sent from ERP, but fails to enter in SUS, the information in ERP is that the sending status is success, but in fact the material document didn't enter in SUS. In this situations, we intend to have the information in ERP side that the document replication wasn't successfully processed
Is this possible? If yes, how can we proceed?
Thanks in advance.
Best regards,
João Salgado